Below Grade     Waterproofing
Under Slab     Waterproofing
Split Slab &     Planter     Waterproofing
Gas Barrier
Crawl Space
Deck Coatings
Door & Window     Waterproofing
Air Barrier
Drainage Systems
Water Features &     Pools
Waterstops
Tile Deck Drainage
At Grade     Termination
Remedial     Waterproofing
Specialty Products

Below Grade Waterproofing > Foundation Walls/Living Space

Epro System III
Epro System III foundation waterproofing for living space

Epro provides a redundant waterproofing system
Epro provides a redundant waterproofing system for the structure


Project ready to continue

Ecoshield 10 protecting footing
Ecoshield 10 protecting footing

Drain board installed to top of wall
Drain board installed to top of wall




CETCO Swelltite installed
CETCO Swelltite installed on below grade living space walls

Swelltite being installed in lifts
Swelltite being installed in lifts

French drain being installed
French drain being installed

Volclay Seamtape, M2000
Volclay Seamtape, M2000, CETCO recommended flashing material installed at Swelltite termination




Roller grade & mesh details
Roller grade & mesh details installed before spray applied membrane

Installer at top of wall
Installer at top of wall holding plastic at grade line to ensure waterproofing stops at grade line

60 mil spray applied membrane
60 mil spray applied membrane over roller grade & mesh detail-note clean line at grade




Primer and JS500
Primer and JS500 installed at cold joints

Prime entire wall
Prime entire wall and install Jiffy Seal 140/60 membrane

Working from the roll
Working from the roll, make sure membrane is fully adhered to footing wall connection, roll membrane onto footing 6 inches and cut

Remove Zip Strip
Remove "Zip Strip", overlap next sheet 2 1/2 inches, you will then have a sticky to sticky membrane seam

JS160 mastic installed
JS160 mastic installed on top and bottom ending edges-remove face film and bond drain board to face of membrane

Adhere fabric flaps on drain
Adhere fabric flaps on drain board shut to prevent root and dirt intrusion




First lift of Epro System III
First lift of Epro System III being installed on parking structure walls

Walls being back filled
Walls being back filled and compacted, ready for second lift

Base drain installed at base of wall
Base drain installed at base of wall