805-485-0700 info@eswsinc.com

AT GRADE TERMINATION

Sureterm termination bar

Sureterm protects the waterproofing top edge and will secure drain panels and protection boards.

Termination bar installed around the entire building.

Termination bar & Membrane C to plate line

Termination bar & Membrane C before copper pan

Planter with Membrane C to be scratched and color coated.

Retaining wall termination with Membrane C up wall and over cap to receive color coat

Epro mesh & Ecoline R terminating top of drain board

Membrane C to grade line

Colored Membrane C installed instead of stucco

Matched to building

Complete wall coated with Membrane C

Epro System III lagging wall at grade line

Installing Ecoline R and mesh to seal top of drain board

Detail complete

Same process used for I beam at grade line

Finished product

3441 Galaxy Place
Oxnard, CA 93030

Phone: (805) 485-0700
Fax: (805) 485-0709

429 W Levers Place
Orange, CA 92867

Phone: (714) 282-1050
Fax: (714) 282-1103

Translate ยป